SIMPLIFYING THE UPGRADE PROCESS
You don’t need to worry about production downtime or massive capital expenses. Dragon V has designed a simple, fast, and safe 4-step transfer process, specifically tailored for plating shops looking to eliminate their old Cyanide process.
THE LEAN 4-STEP ROADMAP
STEP 1: SURVEY & ASSESSMENT
- Current State Capture: Audit the existing plating line and assess risks associated with toxic chemicals.
- Reuse Confirmation: Verify that 100% of your current equipment is compatible for integration.
- Plan Proposal: Deliver a detailed transition roadmap and performance objective targets.
STEP 2: IMPLEMENTATION & CONVERSION
- Safe Disposal: Provide support for the safe and complete disposal of residual Cyanide chemicals.
- Semiconductor Bath Setup: Transfer and prepare the DENBP/ST-01 solution into the tanks.
- Trial Run: Execute the 2-step trial (Pre-treatment $\rightarrow$ Semiconductor Plating) using your products.
STEP 3: TRAINING & STANDARDIZATION
- Operational Training: Provide in-depth training on the 2-step process and core parameter management (pH, Temperature, Current).
- Quality Control: Instruction on maintaining the bath and conducting on-site quality checks (e.g., adhesion testing).
- Documentation Handover: Supply standardized operational and troubleshooting guides.
STEP 4: MAINTENANCE & OPERATIONAL SUPPORT
- Long-Term Support: Commitment to a lifetime warranty on the DENBP/ST-01 product.
- Periodic Analysis: Provide regular bath analysis services to maintain peak quality.
- Green Certification: Support in obtaining official “Cyanide-Free” certification.

