TIME ANALYSIS: FROM HOURS TO MINUTES
In barrel plating, time is money. The traditional process requires plating lines to operate for 255 to 385 minutes (i.e., 4 to 6 hours) per batch due to the required 3 intermediate plating steps.
| CRITERIA | TRADITIONAL TECHNOLOGY | DRAGON V SOLUTION |
| Total Plating Time | 255 – 385 minutes | 45 – 75 minutes |
| Productivity Growth | 1X | 5X – 6X |
Cutting the core plating time down to roughly 60 minutes/barrel frees up massive capacity, enabling you to meet larger order volumes without expanding your facility.
30%-60% OPTIMIZATION OF OPERATIONAL COSTS (OPEX)
The cost reduction capability of DENBP/ST-01 is a powerful chain reaction, impacting 3 major cost centers simultaneously:
- Chemical Savings: Eliminates 100% of the need to purchase and replenish CuCN salts and other intermediate strike chemicals.
- Waste Treatment Savings: Eliminates toxic Cyanide-based hazardous sludge, significantly reducing regulated waste disposal expenses.
- Energy & Labor Savings: Shorter processing time directly reduces consumption of electricity and water, and optimizes labor deployment.
0 INVESTMENT VALUE: CAPITAL CAPEX PRESERVATION
One of the largest barriers to technology adoption is the initial capital expenditure (CAPEX). With DENBP/ST-01:
- 100% Line Reuse: The technology is engineered to operate seamlessly on 100% of your existing tanks, barrels, and rectifier equipment.
- CAPEX Elimination: You avoid all costs associated with purchasing, installing, or building new Cu strike tanks or specialized Cyanide treatment systems.
